Better Roads for Woden

Guideline ACT was awarded, by Transport Canberra & City Services through Procurement ACT , Better Roads for Woden-Intersection Safety Upgrades in December 16 with work starting on site in January 17.The project encompasses the upgrading of the intersections on Launceston Street & Hindmarsh Drive & Eggleston Crescent & Hindmarsh Drive. Both of these intersections are vital access points for Lyons and Chifley respectively and to the overall traffic flow for the Woden area. The upgrading of these intersection will ensure the...

read more

Mugga Water Pump Station

Guideline ACT was awarded the “Mugga Water Pump Station Augmentation & Ancillaries Project” on the 19th of December 2016 by Icon Water. The project represents significant upgrades to the Icon Water infrastructure, with contract works at a number of locations around the ACT. The majority of works are based at the Mugga Water Pump Station (WPS) which replaces two existing pump stations, which will be demolished. The works include the construction of a rising main and new pump station building including the infrastructure surrounding the...

read more

Googong Integrated Water Cycle West Network Stage C

Guideline ACT was awarded the ‘Googong Integrated Water Cycle – Stage C West’ 17th June 2016. Googong IWC West forms part of the development of the Googong Township. The new Googong Township will be home to over 18,000 people and continually developed over the next 25 years.   Stage C IWC West specifically involves the construction of two reservoirs (4.0ML and 1.9ML), approximately 5km of pipework connecting to existing infrastructure and an intricate under and above ground pipe network. The completed reservoir site is intended...

read more

Googong Integrated Water Cycle East Network Stage C & D – “another vital piece of infrastructure”

Guideline ACT has been award the Googong IWC Network East Works Stage CD by Icon Water for the new residential development at Googong with commencement in earnest from September 2016. The $4 million project encompasses the following works; Construction of the Potable Water Top Up to WRP Pumping Station (PWTUPS) Building. Three pumps, valves, control panels, cabling, instrumentation, telemetry, lighting, buried pipework, scour valves, flowmeter, stormwater, pits, conduits and access paths associated and adjacent to the PWTUPS...

read more

Constitution Avenue Upgrade – “on the road to completion”

Constitution Avenue Upgrade – “on the road to completion”

The determined Guideline ACT team’s effort and hard work is on target to complete the signature project on contractual project time, weather permitting. Constitution Avenue Upgrade is experiencing a transformation to its final goal – a vibrant, mixed use, tree-lined grand avenue with public transport, cycling and pedestrian infrastructure; a place for people to meet and promote sustainable transport. Currently work is predominately focused on the Northern side of Constitution Avenue to enable a traffic switch in early June 2016 to open...

read more

Cravens Creek Update May 2016

Cravens Creek Update May 2016

Guideline ACT moved into the scenic Molonglo valley overlooking Cravens Creek in August 2015, to construct the Cravens Creek Water Quality Control Pond.  The construction of the 59 Ml pond included installing a grout curtain into the fractured rock under  which the 12m high embankment wall would be built, a primary and secondary spillway to control the dam levels for flood events, a gross pollutant trap to maintain the water quality entering the pond and various landscaping areas around the pond. With a speedy establishment on site the...

read more

Sewer Pump Station 2

Sewer Pump Station 2

The project involves 2 main activities. The Interim Reservoir Potable Water Booster Pumping Station, consists of pipe works, installation of pumps, electrical and telemetry, known as Separable Portion 1. And Sewage Pumping Station (SPS 2), consists of emergency storage tanks, dual rising main from SPS 2 to the new Water Recycling Plant at Googong Dam Rd and ancillary works, known as Separable Portion 2.

read more

Cravens Creek Water Quality Control Pond

Cravens Creek Water Quality Control Pond

  Project Location: Molonglo Valley Client: Procurement & Capital Works Client’s Representative:  Sri Tharan Superintendent: Cardno Young Superintendent’s Representative: Tom Layton Project Start Date: July 2015 Type of Contract: AS 2124 Description: Cravens Creek Water Quality Control Pond includes civil, structural and landscape works associated with the construction of a water quality pond with capacity of 59 ML. the main feature is construction of an embankment across Cravens Creek consisting of a clay core with rock facing...

read more

Strengthening of Bridge at Woolshed Creek

Strengthening of Bridge at Woolshed Creek

  Project Location: Woolshed Creek Client: TAMS Pankaj Nailwal Superintendent: SMEC Superintendent’s Representative: Project Start Date: July 2015 Type of Contract: AS2124 Description: The project is the Strengthening of Bridge 2074 located on Fairbairn Avenue over Woolshed Creek. The project involves strengthening of a precast plank bridge by installing new steel girders under the planks. Associated works include temporary traffic management, crack sealing, installation of brackets, lateral restraints and bracings. Scope of Works: The...

read more

Googong Bulk Water Offtake

Googong Bulk Water Offtake

Works involving the delivery of a DN450 offtake cut into the DN1800 bulk water pipeline. The new connection will include 30m of new DN1800 pipeline inclusive of 2No. DN1800 butterfly valves, bypasses, scours, DN450 offtake manifold and construction of valve chamber. The DN450 offtake manifold will connect to the Bulk water pump station suction main at the tie in point adjacent to the Bulk Water Pump Station building and then pump to the new township of Googong supplying uninterrupted drinking water.

read more

P6 School Bulk Earthworks

P6 School Bulk Earthworks

Earthworks to construct 7 level pads for the new P6 School buildings

read more

Constitution Avenue Upgrade

Constitution Avenue Upgrade

Constitution Avenue Upgrade is a $42 million project funded by the Australian Government in celebration of Canberra’s Centenary that will result in a vibrant, mixed-use, tree-lined grand avenue with enhanced public transport, cycling and pedestrian infrastructure.

read more