Constitution Avenue Upgrade – “on the road to completion”

Constitution Avenue Upgrade – “on the road to completion”

The determined Guideline ACT team’s effort and hard work is on target to complete the signature project on contractual project time, weather permitting. Constitution Avenue Upgrade is experiencing a transformation to its final goal – a vibrant, mixed use, tree-lined grand avenue with public transport, cycling and pedestrian infrastructure; a place for people to meet and promote sustainable transport. Currently work is predominately focused on the Northern side of Constitution Avenue to enable a traffic switch in early June 2016 to open...

read more

Sewer Pump Station 2

Sewer Pump Station 2

The project involves 2 main activities. The Interim Reservoir Potable Water Booster Pumping Station, consists of pipe works, installation of pumps, electrical and telemetry, known as Separable Portion 1. And Sewage Pumping Station (SPS 2), consists of emergency storage tanks, dual rising main from SPS 2 to the new Water Recycling Plant at Googong Dam Rd and ancillary works, known as Separable Portion 2.

read more

Strengthening of Bridge at Woolshed Creek

Strengthening of Bridge at Woolshed Creek

  Project Location: Woolshed Creek Client: TAMS Pankaj Nailwal Superintendent: SMEC Superintendent’s Representative: Project Start Date: July 2015 Type of Contract: AS2124 Description: The project is the Strengthening of Bridge 2074 located on Fairbairn Avenue over Woolshed Creek. The project involves strengthening of a precast plank bridge by installing new steel girders under the planks. Associated works include temporary traffic management, crack sealing, installation of brackets, lateral restraints and bracings. Scope of Works: The...

read more

Googong Bulk Water Offtake

Googong Bulk Water Offtake

Works involving the delivery of a DN450 offtake cut into the DN1800 bulk water pipeline. The new connection will include 30m of new DN1800 pipeline inclusive of 2No. DN1800 butterfly valves, bypasses, scours, DN450 offtake manifold and construction of valve chamber. The DN450 offtake manifold will connect to the Bulk water pump station suction main at the tie in point adjacent to the Bulk Water Pump Station building and then pump to the new township of Googong supplying uninterrupted drinking water.

read more

P6 School Bulk Earthworks

P6 School Bulk Earthworks

Earthworks to construct 7 level pads for the new P6 School buildings

read more

IKEA Canberra

IKEA Canberra

Civil Works for the new Canberra IKEA site

read more

Lyneham Tennis Centre, Pavilion and Courts Upgrade

Lyneham Tennis Centre, Pavilion and Courts Upgrade

The re-development of the Lyneham tennis centre includes the construction of a pavilion area consisting of seating over-looking the new playing surfaces, a café and new hard courts surfaces both in-door and out-door.

read more

DSS36 Antenna Pedestal

DSS36 Antenna Pedestal

Construction of a Pedestal for a new 34m BWG Antenna for NASA including installation of the azimuth track and fit out works within the pedestal.

read more

Ngunnawal Retirement Village

Ngunnawal Retirement Village

The 6.23 hectare site located within the existing Ngunnawal community will consist of 161 single level independent living villas, a community Clubhouse and feature landscape gardens. Construction will be undertaken in four separate stages with the first stage civil work nearing completion.

read more

Variation 109

Variation 109

The purpose of Variation 109 is to provide services and connection from John Gorton Drive to future subdivision.

read more

Uriarra Link Watermain

Uriarra Link Watermain

The water main is approximately 3.0 km in length connecting the existing DN1200 Stromlo-Higgins and DN900 Stromlo-Belconnen bulk water mains and has an off-take for the proposed Oddie Reservoir (constructed under a separate contract).

read more

Googong Integrated Water Cycle (IWC) Network East

Googong Integrated Water Cycle (IWC) Network East

The Googong Integrated Water Cycle (IWC) Network East project includes construction of a bulk water pumping station, mains pipework and a bulk water pumping station access road. This project has many environmental constraints due to it's location.

read more